octanis-1:mission_overview

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
octanis-1:mission_overview [2016/05/30 01:53]
sam [Drive Test A]
octanis-1:mission_overview [2016/10/12 17:21]
sam [Octanis 1 Mission Overview]
Line 6: Line 6:
  
   * **Mission Type**: Deployment of [[orb:overview|Rover]] (no balloon)   * **Mission Type**: Deployment of [[orb:overview|Rover]] (no balloon)
-  * **Communications**: Telemetry: Iridium to ground control +  * **Communications**: Telemetry: Iridium to ground control + LoRa to field station 
-  * **Start of Mission**: DATE LOCATION +  * **Handover of hardware for shipment**: 19.09.2016 / GRENOBLE, France 
-  * **End of Mission**: DATE LOCATION +  * **Start of Mission**: ??.11.2016 Cape Prud'homme, Antarctica 
-  * **First Deployment of Rover**: DATE LOCATION+  * **End of Mission**: ??.02.2017 (?) Cape Prud'homme, Antarctica 
 +  * **First Deployment of Rover**: ??.11.2016 Cape Prud'homme, Antarctica
   * **Team**:   * **Team**:
-    * Rover OperatorIPEV +    * Rover Operators 
-    * Ground ControlOctanis Association, Switzerland+      * Laurent 
 +    * Ground Control 
 +      * Octanis Association, Switzerland
  
  
  • octanis-1/mission_overview.txt
  • Last modified: 6 years ago
  • by sam