Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
octanis-1:mission_overview [2016/05/30 01:45] sam [Drive Test A] |
octanis-1:mission_overview [2016/05/30 01:57] raffael [Octanis 1 Mission Overview] |
||
---|---|---|---|
Line 6: | Line 6: | ||
* **Mission Type**: Deployment of [[orb: | * **Mission Type**: Deployment of [[orb: | ||
- | * **Communications**: | + | * **Communications**: |
- | * **Start of Mission**: | + | * **Handover of hardware for shipment**: 22.08.2016 / CNRS, Saint Martin d' |
- | * **End of Mission**: | + | * **Start of Mission**: |
- | * **First Deployment of Rover**: | + | * **End of Mission**: |
+ | * **First Deployment of Rover**: | ||
* **Team**: | * **Team**: | ||
- | * Rover Operator: IPEV | + | * Rover Operators: |
- | * Ground Control: Octanis Association, | + | * Laurent Arnaud |
+ | * Christophe Genthon | ||
+ | * Ground Control | ||
+ | * Octanis Association, | ||
Line 20: | Line 24: | ||
100m^2 area shall be plotted in Mission Planner and sent to the rover, who will attempt to cover the whole area. | 100m^2 area shall be plotted in Mission Planner and sent to the rover, who will attempt to cover the whole area. | ||
This test will take 1-2h preparation time and 1-2h driving time. | This test will take 1-2h preparation time and 1-2h driving time. | ||
+ | |||
+ | {{ : | ||
===== Drive Test B ===== | ===== Drive Test B ===== | ||